News

New high load biogas technology

06.06.2018
Teofil-2 project is a break through for the entire biogas industry. 10.5 MW biogas plant started operation. A unique technology of high-load reactors is used. Solid content inside reactor is 16%. In a normal reactor solid content is just 5-7%. The new technology is especially good for maize silage. The new technology effected in reduction of tank volumes for 2 times. CapEx is reduced 1.5 times.