06 June 2018
New high-load biogas technology
The Teofil-2 project is a breakthrough for the entire biogas industry. The 10.5 MW biogas plant started operation. A unique technology of high-load reactors is used. The solid content inside the reactor is 16%. In a normal reactor, solid content is just 5-7%. The new technology is especially suited for maize silage.
The new technology allows a reduction of tank volumes by half. Therefore, CapEx may be reduced 1.5 times.
Share in social networks: